Installation Readiness Checklist

Wellbore and Completion

  • Verify casing and tubing integrity.
  • Confirm packer compatibility with planned jet pump size.
  • Review deviation survey for intake placement.
  • Ensure sliding sleeves (if present) are operational.

Power Fluid Requirements

  • Test water or oil quality for solids and compatibility.
  • Confirm chemical treatment capability if needed.
  • Validate filtration equipment.

Surface Equipment

  • Inspect high-pressure pump condition.
  • Verify dampener charge levels.
  • Confirm separator capacity.
  • Check for adequate power supply.

Operational Preparedness

  • Review sizing calculations.
  • Confirm availability of appropriate nozzle and throat sizes.
  • Ensure monitoring instruments are functional.
  • Review safety procedures for high-pressure operations.